EasyManua.ls Logo

Alcatel-Lucent 7450 ESS-7 - Rack Clearance Requirements

Alcatel-Lucent 7450 ESS-7
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Site Preparation
7450 ESS-7 Page 45
Rack Clearance Requirements
Allow at least 3-inch clearance on the sides of the rack for proper airflow and at least 20-inches in
the front and rear of the rack for maintenance access and to allow space to remove and install SF/
CPM, IOMs, MDAs, and AC PSMs in the front and allow space to remove and install the fan and
filter trays and DC or AC PEMs in the rear.
Figure 11: Chassis Clearance Requirements
FRONT
REAR
20” REAR
REQUIRED FOR MAINTENANCE
20” FRONT
REQUIRED FOR MAINTENANCE
3” SIDE
RECOMMENDED FOR AIR FLOW AND
MAINTENANCE

Table of Contents

Other manuals for Alcatel-Lucent 7450 ESS-7

Related product manuals