EasyManua.ls Logo

Allied Telesis AT-x230-28GP - Figure 36: Mounting an AT-X230-18 GP, AT-X230-18 GT, or

Allied Telesis AT-x230-28GP
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-x230-10GT, AT-x230-10GP, AT-x230-18GT, AT-x230-18GP, AT-x230-28GT and AT-x230-28GP Switch Installation Guide
63
3. Mount the switch in a 19-inch equipment rack using four equipment
rack screws (supplied with the equipment rack) (Figure 36).
F
IGURE 36. MOUNTING AN AT-X230-18GP, AT-X230-18GT, OR
AT-
X230-28GT SWITCH IN AN EQUIPMENT RACK
4. Go to “Cabling the switch” on page 70

Table of Contents

Other manuals for Allied Telesis AT-x230-28GP

Related product manuals