EasyManua.ls Logo

Allied Telesis AT-x230-28GP - Installing an AT-X230-10 GT Switch on a Wall; Figure 39: Ridges on the AT-BRKT-J23 that the Switch Rests on When Installed with the Front Panel Facing up

Allied Telesis AT-x230-28GP
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Installation
66
Installing an AT-x230-10GT switch on a wall
These instructions show you how to install an AT-x230-10GT switch on a
wall. The wall mount kit is AT-BRKT-J23 and can be purchased separately
from your Allied Telesis dealer.
Before you start, ensure that the wall is sturdy enough to hold the switch’s
weight. You may need to position the switch so that the brackets can be
screwed into the wall’s framing timber or an equivalent structural element.
To install the switch on a wall, perform the following procedure:
1. If the rubber feet are attached to the bottom of the switch, remove
them with a screwdriver (Figure 26 on page 56), then turn the switch
back over.
2. Determine the desired bracket position on the wall and screw the
brackets to the wall with the screws included in the wall mount kit.
You can install the switch with the front panel facing up (as shown in
Figure 40 on the next page), left, or right (as shown in Figure 41 on the
next page). Do not install the switch with the front panel facing down.
Note that the brackets are not attached to the switch, but only to the
wall.
If you install the switch with the front panel facing up, the switch will
rest on the edges of the bracket, as shown in Figure 39.
F
IGURE 39. RIDGES ON THE AT-BRKT-J23 THAT THE SWITCH RESTS ON
WHEN INSTALLED WITH THE FRONT PANEL FACING UP
Ridges
Attached to wall

Table of Contents

Other manuals for Allied Telesis AT-x230-28GP

Related product manuals