T4PGF1 INSTRUCTION MANUAL Page 17
SHAW-ALMEX INDUSTRIES LIMITED June 14 2017
11.2 Maintenance Schedule Check Sheet
Maintenance Schedule
*
All information to be printed and completed in ink.
Company Performing Inspection:
Location of Inspection:
EQUIPMENT/ASSEMBLY Prior
to
each
use
Every
month
or 30
cycles
Every
6 th
month
or
180
cycles
Every
Year
Please
initial if
the item
passed the
inspection
COMMENTS
Having an Almex technician inspect the control
panel to verify original operation, design, and
function, is highly recommended.
X
X
Complete system operation check, (see Daily
Testing Sec 8)
X X X X
Electrical cable and cords are in good working
order and free of damage and visibly labeled.
check continuity of the cables
X
X
X
X
Receptacle and Locking Clamp Condition
Inspection
X
X
X
X
Case Condition, (Damage or loose screws).
X X X X
All warnings and Indication / Serial Label
inspection for Voltage, Phase and Hz
Information are Easily Visible.
X
X
X
X
All controls must be free of damage and leaks.
X
X
X
X
Check Earth / Ground Fault System with the
Test Button And look for Visual Indication.
X
X
X
X
Confirm All Indication Lights Function.
X X X X
Check All Earth Resistance values by Checking
Resistance Continuity from The Main Incoming
Earth To the Receptacle Earths, face plate and
cases. All Earths/Grounds MUST be below 0.5
Ohms.
X X X X