53
We reserve the right to modify technical specifications without prior notice.
UK830300/170717 © Alpha-InnoTec GmbH
FOR pREpARATION OF THE COMpLETION REpORT FOR HEAT pUMp SySTEMS
The general checklist is intended as an aid for the installation and assembly personnel. It makes no claim to be exhaustive. Never-
theless, all items must be checked carefully for compliance.
Heat source air
Heating
Channels closed and sealed
□
Yes Volume flow ¹)
□
O.K.
Weather protection screen installed
□
Yes Heating system designed for maximum ...........°C
Rotary field of fan
□
O.K. Heating system filled, air-free and sealed
□
Yes
Low temperature heating
□
Yes
Heat source brine / heat source water
Radiator heating
□
Yes
Heat source volume flow ¹)
□
O.K. All heating circuits can be opened
□
Yes
Motor protection setting
........... A Forward flow tank
□
Yes
Rotary field of heat source circulating pump
□
O.K. Return flow tank
□
Yes
Heat source filled, air-free and sealed
□
Yes Separating tank
□
Yes
Content
........... l
Brine Additional heating ........ kW
Frost protection down to ...........°C
Hot water
Water with heat pump
□
No
□
Yes
Water quality OK ²)
□
No
□
Yes Request with thermostat
□
Yes
Well system
□
Yes Request with cooling
□
Yes
Other heat source
□
Yes Volume flow ¹)
□
O.K.
Heat exchanger surface ......... m²
Heat Pump Connections sealed
□
Yes
Installation of condensate hose
□
O.K.
Decoupled from structure
□
Yes Electric
Vibration decouplers for the heating
circuit and heat source connections
installed
□
No
□
Yes Rotary field, power network
□
Protective measures inspected
□
Yes
Rotary field of condenser
□
O.K.
Return flow sensor mounted
□
Internal
□
External
Outdoor sensor mounted
□
No
□
Yes
¹) Checked with specification
²) Report of water analysis must be submitted
Checked on: ......................................... By: ...........................................................................................
Signature : ..............................................................................
In Germany the following applies:
Send this completed general checklist to the factory customer service department, together with the completion report for heat
pump systems.
Outside of Germany the following applies:
Send this completed general checklist to the manufacturer’s local partner, together with the completion report for heat pump sys-
tems.
Sending the completion report is also a request for a technician authorized by the manufacturer to commission your heat pump.
FAZ-WP Formblatt UK820522c Stand: 240407
General checklist