EasyManua.ls Logo

Ametek Drexelbrook ThePoint Series - 2.2 Explosion Proofing Considerations

Ametek Drexelbrook ThePoint Series
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ThePoint Series
6
When installing ThePoint instrument, ambient temperature
at electronics must not exceed 70°C (158°F).
When installing ange-mounted sensing elements, keep
mating surfaces and bolts free of paint and corrosion to
ensure proper electrical contact with vessel. Avoid using
excessive amounts of Teon™ tape when installing threaded
sensing elements.
Install systems with threaded NPT connection via wrench
ats on the process connection ONLY.
Locate sensing element to avoid enhancing electrostatic
discharge from process medium, as is good practice with
any thermowell, displacer, or sampler. This includes correct
bonding to tank or silo wall.
If installation area is rated explosion proof and requires
conduit seal ttings, they should be used in accordance with
company standards and local codes.
2.2 Mounting and Installation Guidelines (continued)
WARNING:
ThePoint equipment is rated explosion proof. When installing
in explosion hazardous areas [rated “potentially hazardous”
(EU) or “hazardous classied” (USA)] observe all national and
local regulations as well as specications in the certicate.
Mount sensing element using the following installation
guidelines. Refer to Figure 2-2.
NOZZLE
NOZZLE
Wall build-up
does not extend
past first
insulator.
Cote-shield must
extend through
nozzle and wall
build-up by 2".
Wrong
Nozzle too long;
Cote-shield too short.
Factory-supplied Cote-shield
extends through nozzle and
wall build-up.
Best
Best
No Nozzle
Good
Long Nozzle
Figure 2-2
Installation Considerations