ThePoint Series
A2
CE Installation Supplement
EMC Installation Supplement
A.
To provide additional information that is required to be in compliance with
the CE mark of conformity and 2014/30/EU Directive.
B. Definitions: 1. I/O Sensor/Measurement/Control Port --
level measurement, control, and/or DC power.
2. I/O AC Power --
Any port which provides AC main power to the
instrument.
3. Housing --
Any enclosure where the sensor and transmitter can be
located.
4. Non-metallic applications --
any application where the sensor is
not surrounded by a metallic surface.
C. Installation Specifics:
1. I/O Sensor/Measurement/Control Ports
Wiring must be twisted pair and run in conduit or an equivalent
shielded environment (i.e. shielded braid, cable, etc.).
The shield terminations must be grounded at the source and
destination ports.
Wiring must be run separate from AC main power and/or any
signal exceeding 75 volts DC or 50 volts AC.
2. I/O AC Power Port
Wiring must be run either in conduit or an equivalent shielded
environment (i.e. shielded braid, cable, etc.).
The shield terminations must be grounded at the source and
destination ports.