EasyManua.ls Logo

APQS Lenni - Step 7: Install the Rollers

Default Icon
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
8-1-2021
APQS.com
Lenni Lucey Oparation
Standard Table - Step 7: Install the Rollers
Tools Required: 3/16” Allen Wrench
Phillips Screwdriver
Utility Knife
Unpacking Box 2 Roller Tubes
1. Open Box 2 as you did the Rail Box (Box 1), removing two screws from each end and cutting the strapping tape.
Locate the roller labled “Pick Up” (each of the fabric rollers have stamped labels of “Pick Up”, “Backing” and “Quilt
Top” … the Leveler Bar has no canvas attached and is not labeled).
The labeled end of the three rollers will fit into
the RIGHT table leg (when viewed from the
needle side of the machine). Sample shown
above.
Loosen the screws on each of the Split Roller
Collars using a 3/16” Allen Wrench.

Table of Contents