Table of Contents:
Pre-Installation Preparation
2 Removing the Existing Differential
Checking the Current Backlash Amount
Removing the Differential Center
3 Installing the Air Locker
Insuring Adequate Oil Drainage
Approximate Backlash Shimming
Drilling and Tapping the Bulkhead Port
Assembling the Seal Housing
Reinstalling the Bearing Caps
Setting Up the Bulkhead Fitting
Profiling the Seal Housing Tube
Bench Testing the Air Locker
4 Installing the Air System
Running & Securing the Air Line
Connection to the Bulkhead Fitting
5 Mounting & Connecting the Electrical System
Mounting the Actuator Switch(es)
Wiring the Actuator System
6 Testing & Final Assembly
Testing the Air Locker Actuation
Re-Sealing & Filling the Differential
Post-Installation Check List
Exploded Assembly Diagram