EasyManua.ls Logo

Atag iR 12

Atag iR 12
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation & Servicing instructions ATAG iR-Range
45
Always put back the cover after (maintenance) work and secure it with screws A and B.
Remind to connect this earth cable when placing back the boiler front panel and take care the wire
does not get stuck between front panel and boiler.
Please contact your installer or ATAG Heating Technology Ltd. for further details. Contact details can be
found on the back page of this manual.
After servicing, complete the relevant Service Interval Record section of the Benchmark Checklist
located on the inside back page of the document.
16.1 Component replacement
In the event that parts require replacement, use only genuine parts supplied by ATAG Heating
Technology Ltd.
16.2 User's instructions
Advisetheuserthatforcontinuedefcientandsafeoperation,theboilershouldbeservicedatleastoncea
yearbyqualiedservicingcompany.Itisimportantandstronglyrecommendedthatarrangementsaremade
foramaintenanceagreementwithaqualiedservicingcompanytoensureregularservicingoftheboiler.
Please contact ATAG Heating Technology Ltd. for further details. Contact details can be found on the back
page of this manual.
16.3 Maintenance frequency
ATAG Heating Technology Ltd advises an annual inspection or every 1600 running hours, with a full strip
downserviceasrequired,every4yearsorevery6400runninghours,whatevercomesrst.
16.4 Warranty
For the warranty conditions we refer to the Warranty Card that is supplied with the boiler.
A
B

Related product manuals