EasyManua.ls Logo

Atlas Copco QLT H40

Atlas Copco QLT H40
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 21 -
Maintenance schedule
Before carrying out any maintenance activity, check that the start switch is in position O and that no electrical power is present on the terminals.
Maintenance schedule Daily
Every 500 hours
or yearly
Every 1000 hours Every 2000 hours
Service pak - 2912 6409 05 - -
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Check for air, fuel, coolant and oil leakage x x x x
Check oil and coolant level x x x x
Check or drain water in fuelfilter/waterseparator x x x x
Clean air cleaner and dust bowl x x x x
Visual walk around the unit x x x x
Check tension and condition of the V-belt (1) x x x
Replace engine oil (2) xxx
Replace engine oil filter xxx
Grease door hinges and locks xxx
Replace fuel filter element xxx
Check electrolyte level and terminals of battery x x x
Check electrical system for security of cables and wear x x x
Check engine electrical ground connection x x x
Replace air filter element xxx
Check/clean radiator/cooler fins xx
Check crankcase ventilation system xx

Related product manuals