4. Perform the following actions to install toolless rails:
a. Remove the pins from the front and rear mounting brackets using a flat-tipped
screwdriver.
b. Pull and rotate the rail latch subassemblies to remove them from the mounting
brackets.
c. Attach the left and right mounting rails to the front vertical rack flanges using two pairs
of screws.
d. Slide the left and right back brackets forward against the rear vertical rack flanges and
attach them using two pairs of screws.
Installing the server
December 2018 Installing the Avaya Converged Platform 120 Series 21
Comments on this document? infodev@avaya.com