EasyManua.ls Logo

Avery Dennison ALS 206 - Connecting the External Operator Panel; Mounting the External Operator Panel

Avery Dennison ALS 206
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
3INSTALLATION AND DEINSTALLATION
2.1 UNPACKING, ASSEMBLING AND CONNECTING THE MACHINE
ALS
20X
256
2.1.6 Connecting the external
operator panel
The external operator panel is necessary, if the labeller
is installed at an inaccessible place.
The cable installed to the operator panel is 2.5 m long.
CAUTION!
If the connection cable is longer than 2.5 m,
EMC-caused disturbances can occur.
Only use the factory-installed cable.
Don´t extend the cable.
External and built-in operator panel can be used alter-
nately.
Connect the external operator panel to the mini-DIN
connection [25A].
Mounting the external operator panel
Tool:
Cross-head screwdriver, medium size
Drill 2 holes according to the drawing beside
[26, Arrows].
Open the operation panel housing (4 screws).
Mount the lower part of the housing using 2 M4
screws.
Close the operator panel housing.
[24] External operator panel (Article number: A7474)
[25] Connection (A) for external operator panel.
[26]] Hole distances for wall mounting of the external operator
panel.
A

Table of Contents

Other manuals for Avery Dennison ALS 206

Related product manuals