EasyManua.ls Logo

Azbil AUR890 Series - Page 18

Azbil AUR890 Series
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Chapter 2. Installation, Wiring
(3) Insert screws into the three mounting holes in the lower part of the base unit,
and tighten the screws.
(4) Wire the external connections to the terminal block on the lower part of the
replacement base unit, and then connect the cable connectors of the upper part
of the base unit to the connectors on the lower part.
(5) After connecting the connectors, attach the upper part to the lower part using
the four retaining screws (maximum tightening torque: 1.2 Nm).
Note
Structure of the replacement base unit (Q890A100)
φ 5.5 mounting holes (3)
(Lower part of Q890)
(Upper part of Q890)

Related product manuals