6
© Baxi Heating UK Ltd 2017
CONTENTS
1.0 Introduction 7
2.0 General Layout 8
3.0 Appliance Operation 9
4.0 Technical Data 10
5.0 Dimensions and Fixings 12
6.0 System Details 13
7.0 Site Requirements 16
8.0 Flue Options 21
9.0 Installation 23
10.0 Commissioning 28
11.0 Completion & System Draining 31
12.0 Servicing 32
13.0 Changing Components 34
14.0 Combustion & Calibration 43
15.0 Electrical 44
16.0 Short Parts List 45
17.0 Fault Finding 46
18.0 External Low Voltage Controls 52
19.0 ‘Service Due’ Message 56
Benchmark Checklist 58
Section Page