EasyManua.ls Logo

Becker Centronic SunWindControl SWC62 - Group Controller System Wiring

Becker Centronic SunWindControl SWC62
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connection as group controller
Attention
If using as a group controller, no jumpers may be inserted
between the L and C terminals!
1. Connect the power supply unit as follows:
2. Put the protective caps back on the power supply unit.
3. Fit the power supply unit in the socket.
4. Place the control panel in the frame and insert this into the power supply
unit.
38-en

Related product manuals