Table of contents
Table of contents
1.
2.
3.
4.
5.
General Notes 3
Notes on the documentation 3
Liability conditions 3
Description of safety symbols 3
Basic safety measures 4
Operator's obligation to exercise diligence 5
Operator requirements 5
Product Description 6
Appropriate Use 6
Structure 6
Access to the drives 7
Interfaces 8
USB interfaces 8
Network connection 8
Serial interface 8
DVI-I interface (in use) 8
USB interface (in use) 8
Serial interface (in use) 8
Additional plug-in cards (optional) 8
Installation Instructions 9
Transport and Unpacking 9
Transport 9
Unpacking 9
Installation of the PC 10
Earthing measures 10
Power Supply Connection 11
Electrical data 11
Pin assignment of the connector 11
Fitting the cable 12
Assembling the connector 12
Connecting Power Supply 13
Cable Cross Sections 13
PC_ON, Power-Status 13
Wiring diagram 13
Connecting devices 14
Connecting cables 14
Check voltage rating and connect 14
Operating Instructions 15
Switching the Industrial PC on and off 15
First switching on and driver installation 15
UPS Software Components (optional) 16
Installation on the PC 16
Help files 16
Maintenance 17
Cleaning the Industrial PC 17
Replacing the battery on the motherboard 17
Servicing 17
Shutting down 17
Disposal 17
Troubleshooting 18
Fault correction 18
Service support 19
Beckhoff Service 19
Beckhoff Support 19
Company headquarters 19
CP71xx 1