XPR-10 Series Two-Post Lifts 40 P/N 5900951 ā Rev. D ā May 2019
3. Choose which one of the two Equalizing Cables you are going to put into position first, then
remove the Nut from the Threaded End of that cable.
The Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt were previously removed. If
they were mistakenly re-installed, you need to remove them again.
4. Route the Threaded End of the Equalizing Cable up on the inside of the Post, under the Sheave
Bracket, and then out over the top of the Overhead Assembly.
5. Re-install the Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt.
6. At the other Post, remove the Nut from the Threaded End of the other Equalizing Cable.
The Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt were previously removed. If
they were mistakenly re-installed, you need to remove them again.
7. Route the Threaded End under the Sheave Bracket, then down the Post towards the Lift Head.
8. Re-install both the Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt.
9. Put the Threaded End of the Equalizing Cable through the hole at the top of the Lift Head, then
install the Nut and securely tighten.