XPR-10 Series Two-Post Lifts 48 P/N 5900951 ā Rev. D ā May 2019
The following procedure assumes the Hydraulic Lines were put into position earlier in the installation.
Refer to Routing Hydraulic Lines for more information. If they were
not
put into position earlier,
you must do so now,
before
beginning the following procedure.
To finish connecting the Hydraulic Lines:
1. Locate the Short Hydraulic Line and the remaining Elbow Hydraulic Fitting.
All other components should already be in place. If they are not, go back and install them.
2.
On the Power Unit
, locate a hydraulic pressure out port on the Power Unit (labeled P, P1, or
P2), remove the shipping plug, and install the Elbow Hydraulic Fitting (06 ORB to 06 JIC).
The following drawing shows the locations of the hydraulic pressure out ports on the Power Units
that are available for the XPR-10 Series of Lifts.
Note: There are multiple ports on the Power Units that are used with XPR-10 Series Lifts. However,
each XPR-10 Series Lift uses only one hydraulic pressure out port (labeled P in the drawing
above). Do not connect to any of the other ports and do not connect to more than one
hydraulic pressure out port.