Bergstrom NITE Phoenix - Attaching Hold-Down Brackets; Preparing Cables

Bergstrom NITE Phoenix
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-2
Electrical Installation
3
5
4
Attaching Hold-down Brackets
Set two batteries side-by-side in the
battery box and place a hold-down
bracket on top, with the u-channel
facing up. Take two 5/16″ bolts, place
a 5/16″ flat washer on each, and then
put the bolts through the outer holes.
Tighten each bolt securely from under-
neath using the supplied nuts and
washers. Repeat the procedure for the
other two batteries.
Preparing Cables
The batteries are wired series/parallel
for 6 volt or parallel only for 12 volt.
See diagrams on pages 2-3 and 2-4
Make and Install All Cables described
in steps 6a or 6b depending on which
batteries you are using.
NOTE: Before performing any wiring, Disconnect Truck Batteries.