EasyManua.ls Logo

Bernini M42148 - Flowerbud Finial Top Installation

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
To install the Flowerbud Finial, you will need to use the
clear extension tube included with your Bernini Fountain.
Before installing the extension tube, pull the two ends of
the extension tube apart to about 9 inches (22.8cm).
Flowerbud Finial Top Installation
Step 2: Attach the extension
tube to the water outlet in
the middle of the fountain
bowl.
Step 1: Remove the silicone
cap from the top of the
extension tube.
Step 5: Replace the silicone
cap on to the extension tube.
Step 6: Press the extension
tube down until it is level with
the Flowerbud Finial.
Step 3: Put the Flowerbud
Finial over the top of the
extension tube. Careful, keep
the tube centered in the hole
at the top of the Flowerbud
Finial.
Step 4: Just like the large
bowl and fountain bowl, the
Flowerbud Finial locks into
place using a key system in
the middle of the fountain
bowl. Twist the Flowerbud
Finial a quarter turn clock-
wise to lock it into place.

Related product manuals