User Manual for PH Warming Cabinets Beverage-Air
Rev. 01/21Beverage-Air8
UNIT SET-UP FOR ROLL IN UNITS
Important: The oor where the new roll-in/roll-thru cabinet
is to be permanently located must be level, at surface
prior to installation. Failure to properly level the install your
equipment can void equipment warranty.
If necessary to move the unit after removing it from the
skid, remove all doors and carefully push the cabinet at a
point no more than 36” (inches) from the bottom to avoid
damage.
It is an NSF requirement that roll-in/roll-thru models are
sealed to the oor upon installation.
1. Locate roll-in/roll thru model in exact position in which it
is to be set permanently.
2. Level unit, inserting metal shims under unit where
required. It is important that an accurate carpenter’s level
be used when leveling cabinet
3. Construct a wood form to act as a retainer for the
grouting compound around the entire base of the cabinet.
Pour the grout mixture at various intervals around the form
to assure complete ll under the cabinet
4. Using a wide blade putty knife, taper the grout to a
feather edge.
5. A tube of NSF approved silicone sealer, having an
applicator type nozzle, is highly suited for sealing roll-in/
roll-thru models to the oor. Apply a small uniform bead
completely around the base of the cabinet.