Do you have a question about the BFT ECOSOL and is the answer not in the manual?
Brand | BFT |
---|---|
Model | ECOSOL |
Category | Gate Opener |
Language | English |
10 watts, 24v panel, up to 3 can be installed for increased charging capacity.
For residential and light commercial use, recommends a simple setup with specific components for optimum performance.
Installer's responsibility to comply with national and local laws, codes, and safety standards.
Classifies gate operators for residential, commercial, industrial, and restricted access applications.
Details requirements for obstruction sensing systems and non-contact/contact devices for entrapment protection.
Warnings about improper installation, use, and general safety precautions for gate automation.
Advises on keeping people and property clear, checking safety devices, and proper maintenance.
Regulates power, monitors battery, manages power, processes commands, and receives radio commands.
Controls operators, features self-learning torque settings, and adjustable gate leaf delay.
Locate panel in an unshaded area away from trees and tall structures for optimal sunlight.
Degrees of inclination should be set according to location, with examples provided for Georgia and Wyoming.
Guidelines for adding batteries: use new, same-rating batteries, equalize charge, connect to specific terminals, and set dipswitch.
Photo-beam sensors are for safety devices only; shows wiring diagram.
Install JP14 jumper on Ecosol board to power the Libra UL-R for programming.
Failure to remove the jumper will result in rapid battery discharge.
Steps to enter the programming main menu and navigate it.
How to perform AUTOSET for self-learning torque adjustment, with safety warnings.
Step-by-step guide for programming BFT MITTO remote controls to the ECOSOL system.
Steps to troubleshoot when the system does not power up or the gate doesn't move.
Troubleshooting steps for gate stopping/reversing, or stopping during opening cycles.
Troubleshooting steps for system failure after days of operation, checking jumpers, wiring, and capacity.