EasyManua.ls Logo

Bigassfans Basic 6 - Close-Out Procedure

Bigassfans Basic 6
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
**SEE THE FOLLOWING PAGE FOR NFPA 13 REGULATIONS**
The eld crew supervisor and facility manager are to walk through the completed installation.
The installation is complete and on time in accordance with the original Check-In document. If not, explain:
Conduit runs are installed in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
The fans are correctly placed in accordance with both the Check-In document, Scope of Work, and Layout. If not, explain:
Breaker size and wire type are in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
All safety rules and regulations met in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
Fans have been running for over an hour and operate without visible defect or issue.
The fan is spinning in the correct direction (counterclockwise when viewed from oor).
Angle irons are securely fastened and are without any apparent problems in accordance with installation techniques discussed
at check-in.
If extension tube is 4 ft (1.2 m) or longer, guy wires are in place and there is no evidence of a wobble.
Supervisor or contractor has supplied and explained the Installation Guide. If not, explain:
The supervisor or contractor has explained and I understand how to operate fan including starting/stopping, speed operation,
and power disconnect. If not, explain:
Time in/out and duration are in accordance with Check-In document.
Additional comments:
2348 Innovation Drive
Lexington, KY 40511
Phone: 1-859-233-1271
www.bigasssolutions.com
Close-Out Procedure
(for Big Ass Fans Certied Installers Only)
Date:
Company: Job Name:
Address: Purchase Order No.:
City/State/ZIP:
Contact Name: Phone:
E-mail:

Related product manuals