MARQUE, MODELES ET BREVETS DEPOSES - PRODUITS EXCLUSIFS
Strictly follow the instructions:
Positioning of reactor
Clearance zone (mm) required
to work on the reactor
- The water channel is horizontal.
- The UV lamps are horizontal.
The principal purge is at the
base of the reactor.
- The water channel is vertical
- The UV lamps are horizontal.
- The purges are at the base of the reactor.
Lamps are in vertical
position:
PROHIBITED
MARQUE, MODELES ET BREVETS DEPOSES - PRODUITS EXCLUSIFS
870
490
UV SENSOR