6) Product Installation
▣ Basic Operation
Pay attention to the following in installing FC-700:
① Use it at the temperature between 10 and 40 degrees centigrade and at the humidity
between 30 and 85 percent.
② Check plug-in and treat the Probe Cable carefully.
③ Don’t put several plugs in an outlet.
④ Install the main body at the flat place.
⑤ Avoid using a plug making a noise in plug-in.
⑥ All the setup will be recorded at the interior memory even when it is switched off and
then on.
⑦ Be careful, as it is easy to break by the shock.
⑧ Install it away from dust or inflammable things in consideration of the temperature
and humidity.
▣ Power Supply
Use free voltage of AC between 100 and 250V(50-60Hz, 1.2A). If a plug is put in an outlet, the
“POWER” LED at operation panel will be turned on green. Within the equipment is a battery to
change the date and time even when it is switched off. Use a Type CR2032 3V Lithium Battery.
Don’t throw away batteries carelessly to protect environment, but ask the
hospital for the designated places to dump batteries according to proper
procedure.
Only, use the FC-700 Adapter please.
▣ Plug-in
Put the plug in an outlet of 110V or 220V and connect one side of power cable to the power
adaptor. If you put the plug of power adaptor in the terminal of power adaptor of the main body
of FC-700 and then switch it on, the equipment will work.
If the power supply is normal, LED at the operation panel indicating Power On/Off will be turned
on green.