- 08 -
WARNING:
The Input and Load circuit have to be connected to the same Line Wire.
Figure 3.3 Main Panel Figure 3.4 Sub Panel & single EP500
CRITICAL LOAD
NON-CRITICAL LOAD
NON-CRITICAL LOAD
POWER GRID
MAIN PANEL
POWER GRID
MAIN PANEL
SUB PANEL
POWER GRID
CRITICAL LOAD
Connection of single EP500 with Sub Panel
Cable involved in the package of Sub Panel to connect with EP500 solar
power station.
3.1.1 Single EP500
Cable involved in the package of Sub Panel to connect with EP500.
Figure 3.1 Input Plug
(For EP500)
Figure 3.2 Off-grid Output Plug
(For EP500)