4 BA-077/1EN M6X.20XX
B - Table of contents
A- Orientation diagram 2
B - Table of contents 4
C - Reading guide 5
C.1 - How to use this instruction leaflet 5
D - Safety information 6
D.1- Remaining risks according to ISO EN 12100-2 6
D.2 - Safety decals 6
D.3 - Intended use 6
D.4 - Safety information 6
D.5 - Noise emission 7
D.6 - Dust emission 7
E - EC Declaration of Conformity 8
E.1 - EC Declaration of Conformity 8
E.2 - Technical data 8
2 - Setting up PRO-CENTER 9
2.1 - Unpacking and assembly 9
2.2 - Connecting to compressed air system 11
2.3 - Electrical connection 11
2.4 - Dust extraction 12
3 - How to operate the machine 13
3.1 - Description of operator panels 13
3.2 - Vertical drilling unit 14
3.3 - Vertical drilling and fittings insertion 17
3.4 - Vertical drilling only 18
3.5 - Pre-setting revolver for drilling depth 19
3.6 - Pre-setting revolver for work top setting 20
3.7 - Horizontal drilling unit 21
3.8 - Horizontal drilling 25
4 - Working with PRO-CENTER 27
4.1 - Creating a setup plan 27
4.2 - Overview (assembly - drilling heads - rulers) 29
4.3 - Drilling heads overview 31
4.4 - Rulers overview 35
5 - Maintenance and service 37
5.1 - Maintenance 37
6 - Troubleshooting 38
6.1 - What do the individual flashing signals mean? 38
6.2 - Error during vertical drilling 39
6.3 - Error during horizontal drilling 41
7 - Diagrams 42
7.1 - Electrical diagram 3x400 V 50 Hz 42
7.2 - Pneumatic diagram 43