EasyManua.ls Logo

BMC LD6 - Pre-Delivery Checklist

BMC LD6
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRE–DELIVERY CHECKLIST
43
(Check and Adjust as Required)
1. Hydraulic system oil level.
2. Lubricate backhoe.
3. Remove paint from finished surfaces (backhoe cylinder rods and valve spools.)
4. Backhoe control handles for proper operation.
5. Cycle cylinders to purge air from system.
6. Hydraulic connections for leaks and hoses for proper position to reduce chafing and binding.
7. Control valve relief pressure.
8. Backhoe attachment bolts.
IMPORTANT Warranty registration card must be filled out and returned to Brantly Mfg. Co., P.O. Box 187,
Frederick, Ok., 73542 with pressure, flow and performance information completed to validate warranty. No
warranty claim will be honored unless this data is on file at the factory.