EasyManua.ls Logo

Body Solid G9S - Step 22

Body Solid G9S
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SEE NOTE 1:
A. Apply weight stack numbers to weight stack Top Plate (8) and each Weight Stack Plate
as shown.
SEE NOTE 2: Note the shape of each shroud for proper placement.
B. Weight Stack Shroud (CA) is pre-assembled with Shroud Insert (CB).
Attach Weight Stack Shroud (CA) to the side of the weight stack as shown.
Bolt onto Side Base Frame (B) and Top Pulley Frame (K) using:
Two 87 (3/8” x 5/8” round allen head)
Two 98 (3/8” washer)
C. Attach Weight Stack Shroud (CC) to the other side of this weight stack using:
Two 87 (3/8” x 5/8” round allen head)
Two 98 (3/8” washer)
D. Weight Stack Shroud (CD) is pre-assembled with Shroud Insert (CE).
Attach Weight Stack Shroud (CD) to the side of the weight stack as shown.
Bolt onto Main Base Frame (A) and Top Pulley Frame (K) Using:
Two 87 (3/8” x 5/8” round allen head)
Two 98 (3/8” washer)
E. Attach Weight Stack Shroud (CF) to the other side of this weight stack using:
Two 87 (3/8” x 5/8” round allen head)
Two 98 (3/8” washer)
Be careful to assemble all components
in the sequence they are presented.
mm
Inch
STEP
22
52

Table of Contents

Related product manuals