Table 25 System commissioning report
17.7 Inspection and maintenance protocols
The inspection and maintenance records also serve as a master copy.
Sign and date the completed inspection work.
10. Recording measurements: 31 Full Load Partial load
Flue resistance _________ Pa _________ Pa
Negative pressure in the ventilation air line (measured at
the boiler inlet during partial load)
_________ Pa
(permissible maximum
Gross flue gas temperature t
A
_________ °C _________ °C
Air temperature t
L
_________ °C _________ °C
Net flue gas temperature t
A
- t
L
_________ °C _________ °C
Carbon dioxide content (CO
2
) or oxygen content (O
2
) _________ % _________ %
Flue losses q
A
_________ % _________ %
CO content, air free
_______________ ppm
or
______________ mg/kWh
_______________ ppm
or
______________ mg/kWh
11. Measure the gas supply pressure (static pressure). 29 _________mbar
12. Measure the gas supply pressure. 29 Full load: Partial
13. Check tightness during operation (gas side). 32/ 51
14. Check tightness during operation (flue gas side) . 28
15. Function checks: 31
Check ionisation current. _________ µA
16. Install casing panels. 32
17. Inform operator, hand over technical documentation. 32
18. Correct commissioning by the installing contractor
Signature:_________ _________
19. Signature of operator
Signature:_________ _________
Commissioning work Page Measurements Remarks
Inspection work Page Full Load Partial load Full Load Partial load
1. Check general condition of heating system
(visual inspection and function check)
2. Check the gas and water-bearing system
components for:
•internal leaks
signs of corrosion
signs of ageing
3. Check the concentration of antifreeze/
additives in the heating water (observe the
manufacturer's instructions and the details in
the operator's log).
Concentration:________% Concentration:_________%
4. Check the heating system water pressure. 39
Pre-charge pressure of the expansion
vessel ( expansion vessel installation
instructions)

Table of Contents