EasyManua.ls Logo

Bosch SM036 - Pre Installation Unit Preparation; Corner Cap Installation

Bosch SM036
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SM Series Heat Pump
SM Series Heat Pump6 720 220 406 (2015/02) Subject to change without prior notice
26 | Pre Installation Unit Preparation
PRE INSTALLATION UNIT PREPARATION
Corner Cap Installation Instructions
Each corner cap is stamped with one the following
identifiers: T, T1,T2 B, B1, B2, A.
1. Identify Letter code on each Corner Cap.
(Figure#86)
Figure # 86
2. In preparation for installation identify each
Corner Cap location. (VT & CF Figure#87 and
HZ Figure#88)
Figure # 87
Figure # 88
3. Remove adhesive backing and install each
Corner Cap. (Figure#89 and#90)
Figure # 89
Figure # 90
T
B
A
T2
T1
T1
T1
T2
T2
A
A
A
A
Ensure cabinet surface is clean and free of
debris to ensure proper Corner Cap Adhesion.

Table of Contents

Other manuals for Bosch SM036

Related product manuals