EasyManua.ls Logo

Bosch Tronic 5000 Series - Commissioning of the Appliance; First Commissioning Procedure

Bosch Tronic 5000 Series
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning of the appliance
25
Tronic 5000 – 6721830067 (2021/06)
Place the cables from the operating panel into the cable
conduit.
Fig. 45
Place the cover on the appliance.
Fig. 46
Tighten the fixing screw on the cover of the appliance.
Fig. 47
Fig. 48
7 Commissioning of the appliance
7.1 First commissioning of the appliance
NOTICE
Risk of damage to the appliance!
The initial commissioning of the appliance must be carried out
by a qualified expert who will provide the customer with all the
information required for its proper operation.
Turn on the cold water inlet.
Check the tightness of all connections.

Table of Contents

Related product manuals