EasyManua.ls Logo

BÖWE M21 - Page 32

BÖWE M21
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
M21/M26/M30
24
6 Fixing the Machine in Place 6
Adhesive plugs/shear connectors
Steps:
§ Position the machine in its intended position. Note the transport information in Chapter 4.
Use the holes of the machine trough as a drilling template.
§ Prebore with 16 mm (.6 in) stone drill. Drill in vertically!
Remove the machine or angle bracket.
§ Boreholes: Drill the diameter and depth according to the information provided
by the plug manufacturer and blow out any dust.
For further steps, refer to the information provided by the plug manufacturer.
Note the hardening time.
Position the machine and level.
If the floor is uneven, level the machine with leveling plates and even out the surface with
filler (epoxy resins).
Finish the machine installation according to Point 6.3.

Other manuals for BÖWE M21

Related product manuals