8
Step 5
5-1 If possible, use two people to slowly roll the box completely over so the
unit rests on the Rear Stabilizer and Platform.
Step 4
Parts:
• Platform ( Box 3)
Tools:
• 5/16” Allen Wrench
4-1 Insert Platform into main frame with
the rubber pads pointing downward.
4-2 Install but do not tighten four 1/2”x 3/4”
Allen Bolts in the sides of the frame.
You may have to push up on the wheel
end of the platform to allow screws to
align with the threaded hole in the platform.
You will install an additional screw in the
Platform when the unit is upright.
Rubber Pads point
downward
Main Frame
Platform
Hardware (1:1):
4 Allen Bolt (1/2” X 3/4 ”)
4 Washer (1/2”)
1/2” Allen Bolt
1/2” Washer
Push up on Platform
to align holes.
Unboxing Your Bowfl ex Revolution
™
Home Gym