EasyManua.ls Logo

Bridgeview BALE KING 5300 - Optional 3 Bale Kit (5300 X)

Default Icon
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bridgeview Manufacturing Inc.
Page 25
Optional 3 Bale Kit (5300X)
The Bale King 5300 has an available attachment kit which increases the carrying capacity
of the processor by 50%, while maintaining the easy maneuverability of the two-bale processor.
The attachment kit stores the second loaded bale behind the first and above the third in a set of
powerful hydraulic clamps.
The 3 Bale Kit changes the loading process of the bale processor slightly. The loading of
the second bale involves lifting the bale so the fork and bale are parallel to the ground, or just
above this point. The clamp will be closed around the bale at this point and the fork can be
lowered back to the ground. The third bale can then be backed under and lifted until it is lightly
supporting the second bale. After the first bale processing is complete, the clamp can be opened
(while the third bale is supporting the second), and the fork can be lifted until the third bale
pushes the second into the tub.
An optional back-up camera is available to aid in the loading process by giving the
operator direct visibility of the loading forks, even with a bale in the tub. See the next section for
more information.