3 Bale Kit Loading Sequence:
1. Position the tractor and the Bale King so as to be lined up to back straight into the row of
bales.
2. Ensure the bale clamp is opened fully.
3. When close to the bale, lower the forks
completely (you will feel a light
vibration as the forks bottom out
against the frame).
4. Back completely under the first bale.
5. Lift the first bale, allowing the tractor
to roll forward slightly while lifting the
bale. This is because the lifting fork
moves away from the machine slightly
when loading.
6. If you are loading from the same row,
you can dump the bale into the machine
and back straight into the second bale.
If you are going to a different stack for
the second bale, only raise the first bale
enough to clear the ground. Move to the next row and align the machine to the bale
before dumping the bale into the tub. This gives you good visibility to line up to the
second bale.
7. Once you have the first bale in the
tub and the second bale on the forks,
raise the second bale until it presses
on the bale in the tub and then lower
it until the fork is approximately
horizontal or just above. Raising and
then lowering the bale puts it in the
optimal position for clamping and
clearance on the bottom bale.