EasyManua.ls Logo

Briggs & Stratton Standby Generator Systems - User Manual

Briggs & Stratton Standby Generator Systems
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Not for
Reproduction
Installation & Start-Up Manual
Liquid-Cooled
Generator System
This generator is rated in accordance with UL (Underwriters Laboratories) 2200 (stationary engine generator assemblies) and CSA (Canadian Standards
Association) standard C22.2 No. 100-4 (motors and generators).
Standby Generator Systems
Question and Answer IconNeed help?

Do you have a question about the Briggs & Stratton Standby Generator Systems and is the answer not in the manual?

Briggs & Stratton Standby Generator Systems Specifications

General IconGeneral
BrandBriggs & Stratton
ModelStandby Generator Systems
CategoryInverter
LanguageEnglish

Summary

Important Safety Instructions - Part 1

Safety Symbols and Meanings

Explains hazard symbols and signal words used in the manual.

Generator Operation Hazards

Covers risks from CO, exhaust, batteries, and electrical shock.

Important Safety Instructions - Part 2

Voltage, Lifting, and Fuel Safety

Details hazards related to voltage, lifting, and fuel systems.

Exhaust and Airflow Guidelines

Outlines safe clearances for exhaust and proper airflow.

Important Safety Instructions - Part 3

Mechanical, Coolant, and Operational Safety

Covers risks from moving parts, coolant, and general operation.

Installation Overview

Equipment Description and Responsibilities

Defines the generator's purpose and outlines owner/installer duties.

Installation Guidelines

Covers general installation requirements and professional installation needs.

Cold Weather Kit Recommendation

Advises on the use of a cold weather kit for low temperatures.

Installation - Unpacking and Contents

Unpacking and Delivery Inspection

Provides instructions for safely unpacking and inspecting the generator.

Shipment Contents and Not Supplied Items

Lists items included in the shipment and those that must be supplied separately.

Installation - Checklist and Information

Installation Checklist

A comprehensive checklist for verifying installation tasks are completed.

Owner and Contractor Information

Fields for recording owner and installer details for record-keeping.

Generator Placement - Safety Guidelines

Generator Placement Requirements

Details essential safety and location requirements for generator placement.

Generator Placement - CO Risk Reduction

Reducing Carbon Monoxide Risk

Provides guidelines to prevent carbon monoxide buildup and exposure.

Generator Placement - Exhaust Management

Exhaust Gas Direction and Debris Avoidance

Instructions for directing exhaust gas and avoiding debris accumulation.

Generator Placement - Fire Risk Reduction

Fire Risk Reduction Placement

Specifies minimum clearances to reduce fire hazards from exhaust and heat.

Generator Placement - Clearance Examples

Typical Installation Clearances

Illustrates minimum installation distances for fire risk reduction.

Generator Placement - Location Guidelines

General Location Guidelines

Provides additional guidelines for generator location and water drainage.

Concrete Slab Requirements

Details specifications for constructing a proper concrete foundation.

Installation - Connections and Lifting

Electrical and Fuel Inlet Locations

Identifies the locations of electrical and fuel connectors.

Lifting the Generator Safely

Provides instructions and warnings for safely lifting the generator unit.

Installation - Access Ports

Access Ports Overview

Describes the various access panels on the generator enclosure.

Opening and Closing the Roof

Instructions for accessing the generator by opening and closing the roof panel.

Installation - Panel Access Details

Internal Guard and Panel Access

Details procedures for opening internal guards and removing access panels.

Installation - Gaseous Fuel System

Gaseous Fuel System Installation

Outlines rules for flexible gas pipe installation and fuel safety.

Fuel System Information

Fuel Consumption Estimates

Provides estimated fuel usage for natural gas and LP vapor.

Fuel Pressure and Power Loss

Explains required fuel pressure and factors affecting power output.

Fuel Pipe Sizing Considerations

Offers guidance on selecting appropriate fuel pipe sizes.

Fuel Conversion Procedure

Converting Between NG and LP Fuel

Step-by-step guide to convert the generator between natural gas and propane.

System Connectors Overview

Connector Identification and Wiring

Details the function of various connection terminals and blocks.

Power Output Connections

Details specifications for power output connections and wire sizing.

Generator AC Connection System

AC Connection Schematic

Provides a schematic for the generator's AC connection system.

Generator Grounding and Utility Connection

Grounding the Generator

Explains generator grounding requirements and methods.

Utility Circuit Connection

Details how to connect the utility circuit to the generator and transfer switch.

System Control Panel

Control Panel Component Descriptions

Details the purpose of each component on the control panel.

Control Panel Operations

Control Panel Button Functions

Explains the icons and functions of the control panel buttons.

Programming Mode Sequences

Outlines key sequences for accessing programming modes.

General Set Up Screen

Date, Time, and Exercise Cycle Setup

Step-by-step guide for setting date, time, and exercise cycle.

Control Panel Prompts and Navigation

Control Panel Prompts Explained

Describes the messages and states displayed on the control panel.

General System Parameters Navigation

Explains how to navigate through system parameters like run time and date.

Advanced Settings Screen

Viewing and Changing Advanced Settings

Procedures for viewing and modifying advanced generator settings.

Final Installation Considerations

Engine Oil and Coolant Checks

Covers critical checks for engine oil and coolant.

Battery Specifications and Installation

Provides battery requirements and installation guidance.

Initial Start-up and AVR Adjustment

No-Load Start-up Procedure

Step-by-step guide for starting and testing the generator without load.

AVR Adjustment

Instructions for adjusting the Automatic Voltage Regulator (AVR).

Controls and Operation

Automatic Operation Sequence

Explains how the generator automatically starts and stops based on utility power.

Setting the Exercise Timer

Guides on how to set or disable the generator's weekly exercise cycle.

Installation Inspection Requirements

Mandates a final inspection before placing the generator into service.

Schematic Diagram

ECU Connector J1 Pinout

Details the pin assignments for the ECU J1 connector.

Wire Harness and ECU Connector J2

Wire Harness and ECU Connector J2

Shows wire harness connections and ECU J2 pinout.

Wiring Diagram

Alternator and AVR Connections

Shows the wiring for the alternator and Automatic Voltage Regulator (AVR).

Generator Controller and Fuel Valve Wiring

Generator Controller and Fuel Valve Wiring

Details wiring for generator controller and fuel valve assembly.

Related product manuals