F 7.5.2-3 BVS S5 Start-up & Training
Rev 2 8/10/06
8. Was current clamp operation verified? YES NO
9. Were successive impedance readings consistent? YES NO
10. Were the impedance multipliers set? YES NO
Manual or automatic setup? Circle one (Auto for even split ONLY!) M or A
11. Are any interconnect impedance values set? If Yes, load values into SCM. YES NO
12. Did the S5 perform a complete measurement? YES NO
13. Download alarms, measurements and discharge data. If setup data is in memory,
clear memory and delete alarms and measurements from data. YES NO
14. Confirm that Unit & System Analysis & Reports do not generate any false alarms. YES NO
Correct as required.
15. BVS S5 (and BVM) were left in which impedance mode? Average______ Initial_______
16. Are communications available? Telephone modem #____________ YES NO
17. Check communications with ring emulator, if no permanent line installed. YES NO
18. Next read date and time & interval set by agreement with customer? YES NO
(D ___________ T ______:______ Interval ____ hrs or days)
19. Extract setfile as left. Obtain a copy of BVM files. YES NO
20. Controller & TCP firmware version as left: C=_________________; T= ______________
21. Is the BVS fully operational per Operation Manual Procedures? YES NO
Section C. Customer Computer Setup:
1. Was software installed and configured, and did it operate correctly? YES NO
Software Version: BVM ________________PC Operating System_______________
2. If required, was the USB driver installed? YES NO
3. Confirm two way communications for all installed options
4. Download data from controller saved in the customer’s PC data directory YES NO
5. Is the set file, as currently loaded into the S5 Controller, saved in the customer’s data directory?
YES NO
6. Was a custom Battery Map prepared (standard is to complete this onsite)? YES NO
7. Obtain a copy of BVM files as left on customer’s computer. YES NO
8. Is BVM 4.1 & Observer fully operational per Operation Manual Procedures? YES NO
9. Was training provided? YES NO
List names: ___________________ __________________________ _________________
__________________ ___________________ ___________________
__________________ ___________________ ___________________
10. Description of repair work planned: _________________________________________________
Section C. Sign off
Customer: ____________________________________________ Date: ______________
BTECH Representative: _________________________________ Date: ______________
(Write any comments or additional information on back of this sheet.)
Additional comments: _________________________________________________________________________
_____________________________________________________________________________________________