EasyManua.ls Logo

Bucher iValve i250 - Installation and Commissioning; Safety and Environment; Assembly Procedures

Bucher iValve i250
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
iValve Lift Control Valve6 Installation and commissioning
18/31
300-I-9010544-EN-01/10.2014
6 Installation and commissioning
6.1 Safety information
Before beginning any installation and commissioning work, it is a re
quirement that all personnel have read and understood the chapter
"Safety information".
6.1.1 Surroundings
For reliable operation, the following conditions must be maintained in
the surroundings:
General characteristics
Surroundings
Description, value, unit
Requirement
Machine room temperature +2°C … +40°C
Relative air humidity max. 90% (non-condensing)
Packaging materials must be disposed of in accordance with the gener
ally recognised regulations of the respective countries
6.2 Assembly
6.2.1 Hose or pipe
CAUTION!
Contamination in the line
Contamination adversely affects the valve's function. This can
lead to a dangerous system condition.
Preventive measures:
S Clean the hose or pipe before fitting it
S Leave sealing caps/plugs in place until assembly
S Check that all fittings are assembled correctly
S Do not twist the hoses
S Do not mount hoses under tensile strain
S Observe minimum bending radia
S Protect hoses against mechanical damage (e.g. from sharp edges)
S Support hoses with hose clamps (approx. 1.5m away from valve)
Issue: 09.2015
18/31
Reference: 300-I-9010544-EN-01

Related product manuals