iValve Lift Control Valve6 Installation and commissioning
26/31
300-I-9010544-EN-01/10.2014
Carrying out Pipe rupture valve test with Handterminal
1. On the Handterminal select menu 3, then “Adjust./tests”, then “Pipe
rupt. test”
The LED ”down“ on the iCon starts to flash.
2. On the iCon press and hold the push buttons ”ok” and “select”
3. Send DOWN command
4. Wait until the car is accelerating
The LED ”down“ on the iCon flashes faster.
When the triggering speed is reached, the pipe rupture valve closes and
travel stops.
ATTENTION!
If one of the two buttons "ok" or "select" on the iCon is released
during this examination before the pipe rupture valve has tripped,
the iValve closes immediately and the down travel is stopped.
When using the Handterminal the max. actual value / maximum
speed is shown on the display.
In order to finish the pipe rupture test sequence properly:
5. Withdraw the DOWN command
6. On the handterminal, press the "-" key
7. In order to reopen the pipe rupture valve and make the lift ready for
service: build up pressure using the hand pump or carry out an UP
travel
Carrying out Pipe rupture valve test without Handterminal
1. on iCon press the push buttons „ok“ and „select“ simultaneously
when switching ON power supply of iCon => various LEDs start to
flicker (at high frequency = fast)
2. press „select“ => error relay is switched on for about 1 sec.
3. press „ok“ => LED „down“ starts to flash slowly
4. press and hold „ok“ and „select“
5. send DOWN-command
6. continue as described in „Operating Instructions I-9010544-EN“
7. In order to quit the pipe rupture valve test mode: switch iCon off
and on