EasyManua.ls Logo

Buchi Pure C-810 - Calibrating Solvent Level Sensor

Buchi Pure C-810
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Büchi Labortechnik AG
Installation | 5
Operation Manual Pure Chromatography Instruments
27/102
R The solvent you wish to use is part of the solvent library. See Chapter6.3 "Editing
a solvent", page53
u Navigate to the
Solvent Loading
dialog according to the navigation path.
ð The display shows the dialog box
Solvent Loading
.
u Tap the drop-down list next to Line 1.
ð The display shows a drop-down list with selectable solvents.
u Select the solvent which is connected to solvent line 1.
ð The solvent for Line 1 is assigned.
ð The drop-down list closes.
u Repeat the solvent selection for each line.
u Activate the checkbox next to the line you wish to prime.
u Tap the button [Auto Prime].
u Wait till priming finished.
u Tap the button [Close].
ð All lines are assigned with solvents.
ð The dialog box closes.
5.8 Calibrating the solvent level sensor
Navigation path
Tools Calibration and Defaults
Precondition:
R The solvent level sensor is not covered by solvent.
u Navigate to the
Calibration
dialog according to the navigation path.
ð The display shows the dialog box
Calibration
.
u Tap [Zero] for the related solvent line.
u Tap the button [Close].
ð The dialog box closes.
All manuals and user guides at all-guides.com

Table of Contents

Related product manuals