5 | Installation
Büchi Labortechnik AG
30/102
Operation Manual Pure Chromatography Instruments
5.14 Assembling the gas connection (option)
Precondition:
R The gas supply complies with the
specifications. See Chapter3.5 "Technical
data", page18
u Cut 50 mm from the gas tubing.
u Attach the cut tubing to the air filter.
u Secure the tubing in place.
u Attach the tubing from gas supply to the other
side of the air filter.
u Secure the tubing in place.
u Connect the tubing from the gas supply to the
instrument.