EasyManua.ls Logo

Buchi Pure C-810 - Cleaning the Instrument System

Buchi Pure C-810
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Büchi Labortechnik AG
Cleaning and servicing | 7
Operation Manual Pure Chromatography Instruments
77/102
Navigation path
Tools Manual Control Column Flushing...
Precondition:
R A bypass is installed. See Chapter6.4.4 "Installing and removing a column",
page58
u Navigate to the
Column Flushing
dialog according to the navigation path.
Sonicate the check valve
Materials needed:
Open-end wrench, ½”, 9/16" x 5/16"
Torque wrench
u Switch the On/Off master switch to Off.
u Disconnect the mobile phase tubing from the inlet (bottom) of the pump head
using the 9/16” open-end wrench.
u Disconnect the mobile phase outlet tubing from the top of the pump head using
the 5/16” open end wrench.
u Remove both check valve housings from the pump head using the ½” open-end
wrench.
ð The check valve capsule is accessible.
u Sonicating the check valve for 10 min in the appropriate solvent.
u Install the check valve.
u Install the check valve housings back into the pump head.
u Tighten the check valve housing to 75 inch pounds with the ½” torque wrench.
7.6 Cleaning the instrument
Navigation path
Tools Manual Control Column Flushing...
Precondition:
R A purging solvent is assigned to the instrument. See Chapter5.7 "Assigning
solvent to solvent lines", page26
u Install a bypass. See Chapter6.4.4 "Installing and removing a column", page58
All manuals and user guides at all-guides.com

Table of Contents

Related product manuals