EasyManua.ls Logo

Bunn DUAL - Installation and Setup Procedures; Electrical Hook-Up Guidelines; Plumbing Requirements and Hook-Up; Initial Setup Safety Caution

Bunn DUAL
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 4
TROUBLESHOOTING (cont.)
Problem
Brew cycle will not start (cont.)
Automatic refill will not operate
Remedy
Refer to Service - ON/OFF switch for
testing procedures.
Refer to Service - Start switch for
testing procedures.
Refer to Service - Timer for testing
procedures.
Refer to Service - Dispense valve
for testing procedures.
Refer to Service - Control assembly
for testing procedures.
Make sure server is in place and
server present lamp is lit.
Check plumbing and shut-off valves.
(A) Direction of flow arrow must be
pointing towards brewer.
(B) Remove the strainer/flow control
and check for obstructions. Clear or
replace.
Refer to Service - Solenoid valve for
testing procedures.
Refer to Service - Limit thermostat
for testing procedures.
Refer to Service - Overflow protec-
tion switch for testing procedures.
Refer to Service - Level control board
for testing procedures.
Refer to Service - Electronic controls
for testing procedures.
Probable Cause
3. ON/OFF switch
4. Start switch
5. Timer
6. Dispense Valve
7. Control Assembly (Electronic)
8. Server not in place (SH models)
1. No water
2. Water strainer/flow control
3. Solenoid Valve
4. Limit thermostat (Electro/me-
chanical and Electronic)
5. Overflow protection switch
6. (A) Level control board & level
probe. (Electro/mechanical con-
trolled)
(B) Electronic controls
41976 031709

Other manuals for Bunn DUAL

Related product manuals