XI Start-up and Checkout
Usethefollowingprocedureforinitialstart-upoftheboiler:
1) Ifnotalreadydone,ushthesystemtoremovesediment,ux,andtracesofboileradditives.Thisshouldbe
donewiththeboilerisolatedfromthesystem.
2) Filltheboilerandhydronicsystemwithwatermeetingthefollowingrequirementsbelow(alsoseethenoteonthenext
page):
pHbetween6.5and8.5
TotalSolidslessthan2500PPM
Hardnesslessthan120PPM(7Grains/Gallon)
Pressurizethesystemtoatleast12psiattheboiler
3) Checkallnewpipingforleaksandpurgepipingsectionsthatarelledwithair.SeetheNationalFuelGasCodefor
additionalinformationontestingandpurginggaslines.
4) Ventsystemmustbecompleteandfreeofobstructionsbeforeattemptingtoreboiler.Makesurethatthesiliconecure
timecalledforintheventassemblyinstructionshaspassedbeforeringboiler.
5) Inspectalllinevoltagewiringforlooseoruninsulatedconnections.
6) Removethedustcapfromthecondensatetrap(Figure7.51).Addwatertothetrapuntilwaterrunsoutthecondensate
drain.Reinstallthedustcap.
NOTE
SAFE LIGHTING AND OTHER PERFORMANCE CRITERIA WERE MET WITH THE GAS
TRAIN ASSEMBLY PROVIDED ON THE BOILER WHEN THE BOILER UNDERWENT
THE TEST SPECIFIED IN Z21.13.
WARNING
NEVER ATTEMPT TO FILL A HOT EMPTY BOILER
WARNING
• NEVER USE A FLAME TO CHECK FOR GAS LEAKS.
• MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS, GASOLINE AND OTHER FLAMMABLE VAPORS AND
LIQUIDS