30
107774-01 - 9/17
Option 9 10
Illustrated in Figure 7.19 7.20
Pipe Penetration
Through Structure
Vent Roof Roof
Intake Roof Roof
Material
Vent
DuraVent
PolyPro
(Rigid/Flex)
Centrotherm
InnoFlue
SW/Flex
Intake B Vent/PVC B Vent/PVC
Nominal Diameter
Vent 3” 3”
Intake 3” 3”
Min B Vent ID 6” 6”
Min Equivalent Vent Length:
Models
135 36” 36”
150 52” 52”
180 52” 52”
Max Equivalent Vent Length (Note 1):
Models
135 135ft 135ft
150 135ft 135ft
180 135ft 135ft
Vent Manufacturer’s PN for Flex
Termination/Components Required
3PPS-VFT
3PPS-BV*
3PPS-FLEX**
IFBK03****
IAWP03B
* Specify size of B vent (e.g. 3PPS-BV6 is for use with 6” B vent)
** Specify length in feet.
**** Specify Flex length and B-vent diameter (e.g. IFBK032506includes25ftofexandusedwith6”Bvent)
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
SeeequivalentlengthsforexventshowninTable7.14andsizingexampleonnextpage.
VII. Venting C. Design Requirements Unique to Vertical Venting Systems (continued)
Table 7.13b: Summary of Vertical “B-Vent Air Chase” Vent Options
(B-Vent Chase MUST Be Sealed)
NOTICE
Vertical venting and combustion air roof penetrations (where applicable) require the use of roof ashing
and storm collar, which are not supplied with the boiler, to prevent moisture from entering the structure.