9 Decommissioning
Shut down the machine and lock against inadvertent start up.
Vent the connected lines to atmospheric pressure.
Disconnect all connections.
In case of storage is planned:
See Storage [}7].
9.1 Dismantling and Disposal
Drain the oil.
Separate special waste from the machine.
Dispose of special waste in compliance with applicable regulations.
Dispose of the machine as scrap metal.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BUSCH Zebra and is the answer not in the manual?

BUSCH Zebra Specifications

General IconGeneral
BrandBUSCH
ModelZebra
CategoryWater Pump
LanguageEnglish

Related product manuals