Tools required
- Set of Allen keys (no. 3, 4, 5, 6)
- Wrench no. 10
- Wrench no.13
- Concrete drill bit Ø10mm
- Measuring tape
- Impact drill
- Spindle disk grinder with diamond disk
- Flat chisel and hammer
- Mallet
Items delivered with the cover
- End xing plate, motor side (pre-assembled)
- End xing plate, bearing side
- Stainless steel plate for attachment under the
coping (sub-coping mounting plate) (2)
- Axle Ø190
- Motor
- Washer Z8 (x8)
- Hex nut M8 (x8)
- Carriage bolt (x8)
- Hex collar nut (x4)
- Countersunk at socket head screw (CSFSH) M8
x 35 (x4)
- Upat Express bushing (x8)
- Conical spring washer (8)
- Countersunk at socket head screw (CSFSH) M8
x 20 (x8)
- Pin Ø8 x75
- Hex Socket Head Cap screw (HSHC) M6 x 25 (x4)
- Spring washer Ø6 (x4)
- Washer Z6 (x6)
- Countersunk at socket head screw (CSFSH) M6
x 15 (x2)
- Nylstop nut M6 (x2)
- Connecting box angle bracket
- Countersunk at socket head screw (CSFSH) M4
x 16 (x4)
- Connecting box
- Control panel
- Key switch
Number of people required
Number of people necessary for installation:
- Two people to carry and submerge the COVERDECK mechanism.
- Once the COVERDECK mechanism has been submerged, one person to complete the installation.
Time for installation:
- approximately 3 hours.
TABLE OF CONTENTS
INSTALLATION AND SAFETY RECOMMENDATIONS .......................................................PAGE 33
LAYOUT .................................................................................................................................PAGE 34
PREPARATION FOR INSTALLATION ..................................................................................PAGE 34
INFORMATION SUR LE NIVEAU DU BASSIN ....................................................................PAGE 35
ASSEMBLY PRIOR TO SUBMERSION ...............................................................................PAGE 36
SUBMERSION AND ATTACHMENT .....................................................................................PAGE 38
ELECTRICAL WIRING ..........................................................................................................PAGE 40
CONFIGURING THE ENDS OF TRAVEL .............................................................................PAGE 45
OPERATION AND ERROR MESSAGES .............................................................................PAGE 48
USE ....................................................................................................................................PAGE 49
MAINTENANCE AND WINTERING ......................................................................................PAGE 49
BEAM ASSEMBLY ................................................................................................................PAGE 50
CIVIL ENGINEERING ............................................................................................................PAGE 53
MAINTENANCE ....................................................................................................................PAGE 59
2019/01 - Indice de révision : N - Code : 34201 PROTECTION & SÉCURITÉ
32/60