EasyManua.ls Logo

Cafection Encore lite - Annex 2 Monthly Maintenance Schedule; Monthly Maintenance Schedule Overview

Cafection Encore lite
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENCORE LITE Rev. 3 05/2018
www.cafection.com 800-561-6162
82
SERVICE & INSTALLATION MANUAL for Cafection's Encore Lite
Annex 2
ANNEX 2 MONTHLY MAINTENANCE SCHEDULE
MONTHLY MAINTENANCE SCHEDULE
All important parts of the unit must be maintained as per the Maintenance Schedule to honor the warranty and to
avoid possible defects. Adequate maintenance will extend the life of the coffee machine and deliver a consistent
high quality beverage.
ENCORE Series
MVF 04-2017
PERFORMED BY THE SERVICE PROVIDER
Clean the brew group with a commercial urn cleaner.
PREVENTIVE MAINTENANCE SCHEDULE AT DIFFERENT CYCLES
Check & replace the outlet valves.
Check & replace the water filter.
10,000 cycles
5,000 cycles
Replace the brew group via Cafection’s Brew Group Exchange Program.
Replace the whipping motor(s).
25,000 cycles
Delime the water tank & outlet valves.
50,000 cycles
Replace the grinder burrs.
Replace the water tank float, the heater switch & the water level switch.
100,000 cycles
MONTHLY MAINTENANCE
Clean the brew group with a commercial urn cleaner:
Clean the soluble canisters.
Clean the bean hopper & its funnel.
Clean the stainless coffee chute.
Inspect the fan & clean as needed.
Open the machine door.
Add one (1) tablet of commercial urn cleaner in the brewing chamber. Leave the filter paper in place.
In Service mode, press on the“Clean Brew Group (Tabz)” button.
Follow the instructions on the screen.
Order two (2) coffee drinks to complete the filter paper installation, then close the door.

Table of Contents

Related product manuals